1. Understanding the steering order, being able to issue, reply and steer.
2. Understanding the entrance and exit instructions of the departure port section, making deck work safe.
3. To be able to determine the ship position by crossing azimuth.
4. Be able to observe weather and write diary.
Outline:
Practice boarding a n, night lecture at berthing
Style:
·It will be carried out based on the specified schedule.
·Distribute the implementation guidelines one week before practical training.
· Practice notes on boarding, be sure to bring a calculator.
Notice:
·Be sure to board the ship. If you are absent, contact the homeroom teacher and notify them with the reason for your absence.
· If you do not board the boat, you will be disapproved and you will not be able to proceed. (Student service handbook must be read)
· For persons who missed by submitting a prescribed reason sheet, instruct the date and time of boarding later.
|
|
|
Theme |
Goals |
1st Semester |
1st Quarter |
1st |
Explanation of contents of practical training (Previous night cruise exercise 1 day and 2 nights) |
Explanation of contents of practical training (Previous night cruise exercise 1 day and 2 nights)
|
2nd |
Bridge, bow and stern departure port preparation and work procedures |
Bridge, bow and stern departure port preparation and work procedures
|
3rd |
Handling procedure of mooring machine
|
Handling procedure of mooring machine
|
4th |
Shipboard commands, steering commands, an d instructions |
Shipboard commands, steering commands, an d instructions
|
5th |
Name and usage of mooring rope
|
Name and usage of mooring rope
|
6th |
Navigation instrument name type and operation method |
Navigation instrument name type and operation method
|
7th |
Same as above |
Same as above
|
8th |
Same as above |
Same as above
|
2nd Quarter |
9th |
Same as above |
Same as above
|
10th |
Doppler sonar and acoustic sounder operation method |
Doppler sonar and acoustic sounder operation method
|
11th |
Watch bridge |
Watch bridge
|
12th |
Weather observation, watching and reporting procedure |
Weather observation, watching and reporting procedure
|
13th |
How to read and use the chart
|
How to read and use the chart
|
14th |
Measurement method of ship position by terrestrial target |
Measurement method of ship position by terrestrial target
|
15th |
Anchorage watch |
Anchorage watch
|
16th |
Final exam |
Final exam
|
2nd Semester |
3rd Quarter |
1st |
Explanation of contents of practical training (late boarding exercise 1 day and 2 nights) |
Explanation of contents of practical training (late boarding exercise 1 day and 3 nights)
|
2nd |
Bridge, bow and stern departure port preparation and work procedures |
Bridge, bow and stern departure port preparation and work procedures
|
3rd |
Same as above |
Same as above
|
4th |
Shipboard commands, steering commands, and instructions |
Shipboard commands, steering commands, and instructions
|
5th |
Same as above |
Same as above
|
6th |
Watch bridge |
Watch bridge
|
7th |
Same as above |
Same as above
|
8th |
Take over ship's shift |
Take over ship's shift
|
4th Quarter |
9th |
Handling of sextant and measurement of sun altitude
|
Handling of sextant and measurement of sun altitude
|
10th |
Same as above
|
Same as above
|
11th |
Operation of the radar, interpretation of the image and method of measuring the ship's position
|
Operation of the radar, interpretation of the image and method of measuring the ship's position
|
12th |
How to calculate tidal currents |
How to calculate tidal currents
|
13th |
Calculation of sun and moon's appearance time
|
Calculation of sun and moon's appearance time
|
14th |
Night voyage, nighttime watching experience |
Night voyage, nighttime watching experience
|
15th |
Same as above |
Same as above
|
16th |
Final exam |
Final exam
|