1. It is possible to command the marine vessel maneuvering such as changing hands and escape operation.
2. You can ask for a ship in a chart in a short time.
3. The entry and departure port article of the navigation diary can be written.
4. You can do an animal ship maneuvering and work.
5. We can handle VHF in English.
Outline:
Practice boarding a practice boat, night lecture at berthing
Style:
· It will be carried out based on the specified schedule.
· Distribute the implementation guidelines one week before practical training.
Practice notes on boarding, be sure to bring a calculator.
Notice:
·· Be sure to board the ship. If you are absent, contact the homeroom teacher and notify them with the reason for your absence.
· If you do not board the boat, you will be disapproved and you will not be able to proceed. (Student service handbook must be read)
· For persons who missed by submitting a prescribed reason sheet, instruct the date and time of boarding
later.
|
|
|
Theme |
Goals |
1st Semester |
1st Quarter |
1st |
Explanation of contents of practical training (1 day and 2 nights) |
Explanation of contents of practical training (1 day and 3 nights)
|
2nd |
Bridge, bow and stern departure port preparation and work procedures |
Bridge, bow and stern departure port preparation and work procedures
|
3rd |
A shipboard command, a steering command, and instructions
|
A shipboard command, a steering command, and instructions
|
4th |
Watch bridge |
Watch bridge
|
5th |
Same as above |
Same as above
|
6th |
Satellite navigation device, radar operation method and ship position measurement method |
Satellite navigation device, radar operation method and ship position measurement method
|
7th |
Same as above |
Same as above
|
8th |
ARPA, Electronic Chart Display Device, Chart Plotter Operation Method |
ARPA, Electronic Chart Display Device, Chart Plotter Operation Method
|
2nd Quarter |
9th |
Same as above |
Same as above
|
10th |
Logbook, S / B Book How to fill in
|
Logbook, S / B Book How to fill in
|
11th |
Same as above |
Same as above
|
12th |
Voyage English |
Voyage English
|
13th |
Notice of entering / leaving port, filling in quay Applications, other application forms, etc.
|
Notice of entering / leaving port, filling in quay Applications, other application forms, etc.
|
14th |
Same as above |
Same as above
|
15th |
Write a condition report |
Write a condition report
|
16th |
Final exam |
Final exam
|
2nd Semester |
3rd Quarter |
1st |
Explanation of contents of practical training (late boarding exercise 1 day and 2 nights) |
Explanation of contents of practical training (late boarding exercise 1 day and 3 nights)
|
2nd |
Bridge, bow and stern departure port preparation and work procedures |
Bridge, bow and stern departure port preparation and work procedures
|
3rd |
A shipboard command, a steering command, and instructions |
A shipboard command, a steering command, and instructions
|
4th |
Watch bridge |
Watch bridge
|
5th |
Same as above |
Same as above
|
6th |
Voyage planning |
Voyage planning
|
7th |
Same as above |
Same as above
|
8th |
Same as above |
Same as above
|
4th Quarter |
9th |
Ship maneuvering on the shore, operation |
Ship maneuvering on the shore, operation
|
10th |
Same as above
|
Same as above
|
11th |
Same as above
|
Same as above
|
12th |
Same as above
|
Same as above
|
13th |
Same as above
|
Same as above
|
14th |
Weather observation and ship weather observation sheet entry procedure |
Weather observation and ship weather observation sheet entry procedure
|
15th |
Same as above |
Same as above
|
16th |
Final exam |
Final exam
|